State Fair Hound was on the grounds this weekend and we can report that infrastructure improvements continue in preparation for the 2015 New York State Fair. The projects currently nearing completion are consistent with those done over the past several years.
Shown below are the new brick steps on the Dairy Products Building, with a ramp to the left for those who can’t navigate stairs.
A brick patio looks ready outside Baker’s Chicken Coop.
Updated landscaping beautifies the Veteran’s Memorial in front of the Horticulture Building. Some bricks have been added as demand continues from families paying tribute to their vets.
Getting ready for this year, the ever-popular Dinosaur Bar-B-Que stand is up, with staff gearing up for the crowds.
Some paving has been completed in the Iroquois Village, as mentioned in an earlier post.
Check back for more updates on preparations from State Fair Hound.
Leave a Reply